            Sustainability framework
            Our sustainability strategy and policies support best practices and drives encouraging change across the business. They are underlined
            by our corporate strategy which aims to integrate sustainability across business, having in place robust systems and processes
            and focussing on operational efficiencies and carbon abatement plans. The Safety, Health, Environment and Sustainability and
            Risk Management Committees have oversight and ultimate responsibility for sustainability matters. They are regularly updated on
            performance across all internally defined sustainability-related material risk matters. We have facilitated e-enablement for tracking
            sustainability KPIs, the performance of which are used to review strategy on an annual basis.

            Key sustainability initiatives     lamps with 5ft LED lamp for indoor   UK
            undertaken in FY 2019-20           application                        TCE has detailed list of opportunities
                                                Replaced calciner refractories and   to conserve resources and efficiency
                                               furnace chamber                   improvements planned with new boiler
                                                Installed and commissioned a waste oil   at Middlewich
                                               recycling system                   Project sanctioned to increase electricity
            Energy conservation                 Installed two 1.2 kW solar powered    generation on the Lostock steam turbine
            Mithapur                           high-mast lighting systems        and expected to increase electricity
               Replaced traditional lights with LED                              generation of the turbine saving the
              lights and undertook VFD conversion for   North America            site around £70k per annum with this
              HRT, HCT and slurry feed pump resulting     Undertook energy efficiency projects,   steam-generated electricity displacing
              in total power savings of 2,423,023 kWh  resulting in estimated yearly power   electricity generated from natural gas
               Undertook technology switch-over of   savings of 6,364,156 kWh and 20% less   thus reducing the carbon footprint of
              CCG Electrolysers from De Nora to UHDE   coal usage. These projects include:   the site
              which will save 500 kWh per tonne   o  Optimisation of boiler electrostatic     Metering projects are underway across
              of Caustic                         precipitator (ESP)              the sites to better understand their
                                               o  GR2 Dryer 2 Draft Fan VFD      electricity consumption and implement
            Magadi                             o  GR3 Fan Upgrades               focussed efficiency projects
               Replaced 160W mercury vapour flood   o  Baghouse on-demand purging    Use of highly integrated heating system
              lamp with 100W LED flood lamp for     Exploring applications for solar and wind   avoids cooling of the water and helps to
              outdoor applications and 5ft fluorescent
                                               opportunities                     reduce our energy needs