           A.  Conservation of Energy                                In the Cement Plant at Mithapur:
               (i)   The steps taken or Impact on Conservation of    •    Replacement of Cement mill outlet diaphragm
                   Energy:                                               screen segments to improve throughput of the
                     Following Lean Six Sigma (‘LSS’) and non-LSS projects   mill
                   were undertaken during FY 2020-21:                •    Wet fly ash system revival to improve fly ash
                                                                         consumption in Masonry Cement
                   In Soda Ash Plant at Mithapur:
                                                                     •    Fuel mix with Low calorific value (CV) Indonesian
                   •    Replacement of Ammonia Still preheater no. 6
                       and WLDS (Weak Liquor Distillation System) stack   coal
                       cooler to reduce efficiency loss              •    Replacement of conventional lamps/tubes  with
                   •    Replacement of Hydrator no. 1 to improve lime    efficient LEDs
                       hydration and temperature loss                •    Ball mills grinding media regrading to improve
                   •    Replacement of CO  compressor no. 6 to reduce    specific power
                                     2
                       steam and water consumption                   •   Replacement of Coal mill diaphragm
                   •    Insulation of major equipment like Ammonia Still   •    Commissioning of Kakkati vacuum pumps for
                       no. 6, Prelimer no. 6, Steam Tube Dryer nos. 1 and   pumping of  CO  for carbonation of Effluent Solid
                                                                                     2
                       9 to reduce heat loss                             Filtration ('ESF') filter feed slurry
                   •    Trial of various fuels at Soda ash kiln like Siberian
                       Anthracite and coke breeze briquettes           Energy efficiency projects in Power Plant at Mithapur:
                                                                     •    High Pressure Boiler: HPB-3 with Pet coke and
                   In Make-Up Water ('MUW') Plants at Mithapur:
                                                                         South African coal – exhaust flue gas temperature
                   •   Replacement  of  preheater  higher  area  heat    reduced from 150°C to 145°C
                       exchanger to improve energy efficiency in
                       MUW-1 plant                                   •    HPB-4 with Indonesian coal – exhaust flue gas
                                                                         temperature reduced from 150°C to 140°C
                   •   Replacement of evaporator body-101 with new
                       evaporator body having increased height and           Measures undertaken in Electrical Systems at
                       volume in MUW-3 plant
                                                                     Mithapur:
                   •   Optimisation of 120 psig steam consumption by   •    New capital projects being undertaken with
                       providing a small diameter jumper in the 6-inch   energy efficient motors, energy efficient lighting,
                       diameter vacuum line in MUW-3 plant
                                                                         high efficiency distribution transformers and
                   •   Reduction of steam consumption by 25 Metric       Intelligent Motor Control Centres
                       Tonne ('MT") per hour by converting unit-1 and
                       unit-2 double effect evaporator to quadruple   •    Replacement of conventional lamps/tubes  with
                       effect evaporator by using 50 psig steam in       4,835 efficient LEDs
                       MUW-3 plant
                                                                     In the Plant at Mambattu:
                   •   Flowmeter provided in magma draw line to
                       maintain continuity in MUW-4 plant            •     Pressure  Reduction  Turbine  [PRT]  (4  Tonne
                                                                         Per Hour 160 KW): PRT installed with Pressure
                   •   Reduction of magma draw auto valve size from 4    Reducing Valve (PRV - 4 TPH) helps to generate
                       inch to 3 inch for better control in MUW-4 plant  2,400 units per day and simultaneously reduce the
                   •   Flash steam from first effect condensate recycled   steam pressure from 16 bar to 1 bar for process
                       to second effect to improve energy efficiency in   evaporator requirement. The generation of PRT is
                       MUW-4 plant                                       7.2 lakh units annually with 300 days operation